الطيران· AVIATION · PREDICTIVE MAINTENANCE
Tanabbuالتنبؤ بصيانة الطائرات
Know which component fails next — before it grounds an aircraft on the line.
Removal forecasting and maintenance optimization for heavy and line MRO operations — predicting component removals ahead of failure and sequencing work packages so aircraft spend less time on the ground and more time flying.
الصيانة الجيدة لا تنتظر العطل
“Good maintenance doesn’t wait for failure.”
What Tanabbu does
Component removal forecasting
Predicts unscheduled removals days to weeks ahead, using flight-hour, cycle, and sensor trend data.
Heavy & line maintenance optimization
Sequences work packages and slot allocation across hangars and line stations to cut aircraft-on-ground time.
Parts & inventory alignment
Forecast-driven stocking recommendations put the right part at the right station before it’s needed.
Reliability program integration
Feeds directly into existing reliability programs and MPD/CMR task tracking — not a parallel spreadsheet.
Fleet-wide health dashboard
Tail-by-tail health scores across the fleet, ranked by predicted risk and remaining useful life.
Sovereign data residency
Fleet and maintenance data stays in-Kingdom, PDPL-aligned and NDMO-classified.
See Tanabbu in action
An early UX walkthrough of the product, designed bilingually from day one.

Fleet health overview

Removal forecast log

Removal forecast detail
How it works
Ingest
Flight-hour, cycle, ACMS/sensor, and historical defect data flow in from existing fleet and MRO systems.
Predict
Models forecast component removals and estimate remaining useful life, tail by tail.
Plan
Work packages, hangar slots, and parts are sequenced around the forecast, not around a fixed calendar.
Prevent
Components are replaced on a predicted schedule, ahead of in-service failure and unplanned AOG.
Replace parts on your schedule, not the failure’s
We're selecting design-partner MRO operators and carriers for the first pilot cohort. Book a briefing to see the product and discuss fit.
Request a Pilot